Citation: | ZHANG Wenjing. Analysis of Fire Safety Problems and Fire Supervision Strategies in High-Rise Buildings[J]. Intelligent Building and Construction Machinery, 2021, 3(11): 120-122. |
[1] |
朱锐.高层建筑消防隐患及防火监督治理研究[J].消防界(电子版),2020,6(20):69-70.
|
[2] |
鞠洪杰.高层建筑消防隐患及防火监督问题的研究[J].今日消防,2020,5(10):65-66.
|
[3] |
叶歆,许雨.城市高层建筑防火监督检查要点探讨[J].山西建筑,2019,45(08):214-215.
|
[4] |
周庆.简析高层建筑的消防隐患及防火监督策略[J].消防界(电子版),2018,4(03):86+88.
|
[5] |
黄圣超.关于高层建筑消防隐患及防火监督问题的讨论[J].消防界(电子版),2016(04):45-46.
|
[1] | PAN Shanshan. Research on Key Points of Fire Prevention Supervision and Inspection of Urban High-rise Buildings[J]. Intelligent Building and Construction Machinery, 2022, 4(3): 102-104. |
[2] | LI Yu. Application of BIM Technology in Highway Construction Safety Management[J]. Intelligent Building and Construction Machinery, 2021, 3(9): 94-96. |
[3] | SANG Hong. Diffi culties and Main Points Analysis of Fire Fighting and Rescue in High-rise Buildings[J]. Intelligent Building and Construction Machinery, 2021, 3(7): 109-111. |
[4] | LIU Jinjing. On the Causes of Fire in High-Rise Buildings and Fire Safety Design[J]. Intelligent Building and Construction Machinery, 2021, 3(12): 117-119. |
[5] | LIANG Yifeng. Thoughts on the Fire Safety Management of High-rise Buildings in Taizhou[J]. Intelligent Building and Construction Machinery, 2021, 3(3): 117-119. |
[6] | LIN Xiangqi. On the Key Points of Fire Prevention Supervision and Inspection of Urban High-rise Buildings[J]. Intelligent Building and Construction Machinery, 2021, 3(7): 100-102. |
[7] | WANG Tao. Fire Engineering Design and Construction Analysis of High-Rise Buildings[J]. Intelligent Building and Construction Machinery, 2021, 3(12): 123-125. |
[8] | DU Hang. Countermeasures of Strengthening Fire Control Supervision and Management of High-rise Buildings[J]. Intelligent Building and Construction Machinery, 2021, 3(8): 95-97. |
[9] | ZANG Yansheng. Problems and Strategies of Fire Prevention Supervision and Inspection of Urban High-rise Buildings[J]. Intelligent Building and Construction Machinery, 2021, 3(11): 117-119. |
[10] | LI Jiazhang. Current Situation of Fire Safety Management of High-rise Buildings in China and Optimization Suggestions[J]. Intelligent Building and Construction Machinery, 2021, 3(4): 98-100. |
[11] | SONG Chuanzhen. Thinking about Fire Hidden Danger and Fire Prevention Supervision of High Rise Building[J]. Intelligent Building and Construction Machinery, 2021, 3(7): 112-114. |
[12] | MAO Fenghua. How to Do a Good Job of High-rise Building Fire Hazards and Fire Supervision[J]. Intelligent Building and Construction Machinery, 2021, 3(4): 123-125. |
[13] | XU Jiang. Hidden Fire Hazards and Fire Supervision of High-rise Buildings[J]. Intelligent Building and Construction Machinery, 2021, 3(8): 126-128. |
[14] | MA Xiaoming. Research on Hidden Danger and Effective Strategy of Fire Prevention Supervision of High-rise Buildings[J]. Intelligent Building and Construction Machinery, 2021, 3(5): 106-108. |
[15] | LEI Lanlan. Analysis of The Current Situation of Fire Protection Safety of High-Rise Buildings and Fire Protection Countermeasures[J]. Intelligent Building and Construction Machinery, 2021, 3(12): 108-110. |
[16] | WANG Ke. Study on Construction Technology of CFG Pile Composite Foundation for High-rise Building[J]. Intelligent Building and Construction Machinery, 2020, 2(4): 20-21. |
[17] | ZENG Xianchun. Brief Analysis on the Construction Points of Foundation Reinforcement Treatment of High-rise Buildings[J]. Intelligent Building and Construction Machinery, 2020, 2(11): 1-2. |
[18] | WANG Liping. Intelligent City Internet of Things Fire Remote Monitoring System[J]. Intelligent Building and Construction Machinery, 2020, 2(6): 119-120. |
[19] | ZHAO Liang. Discussion on Fire Hidden Danger and Fire Prevention Supervision of High Rise Buildings[J]. Intelligent Building and Construction Machinery, 2020, 2(12): 125-126. |
[20] | GAO Pengcheng. Analysis on Hidden Fire Hazards of High-rise Buildings and Their Fire Protection Supervision Work[J]. Intelligent Building and Construction Machinery, 2020, 2(12): 101-102. |