Citation: | ZHANG Jixin. Analysis of Area Development ABO Mode from the Perspective of Construction Investment Enterprises: Taking the Development Project of a Certain Area in Xi'an as an Example[J]. Intelligent Building and Construction Machinery, 2022, 4(2): 126-128. |
[1] |
杨志昱.关于城市片区开发几种投资模式的对比分析[J].消费导刊,2020(47):179.
|
[2] |
张洲,易雅.新形势下政企合作片区综合开发的发展模式探讨[J].中国房地产业,2020(25):40+43.
|
[3] |
彭敏.关于片区开发模式的有关思考:以湖南某片区开发为例[J].环渤海经济瞭望,2020(4):85.
|
[4] |
罗琳.关于片区综合开发项目运作模式及相关问题的探讨[J].营销界,2019(51):138-139.
|
[5] |
李雷诺.关于片区综合开发项目运作模式及相关问题的探讨经验分析[J].质量与市场,2021(2):163-164.
|
[6] |
范川,王晓东,李彩霞.新形势下片区开发项目运作思路探析[J].中国房地产,2019(25):47-50.
|
[2] | MA Fengping. Discussion on Construction Project Quality Control Based on EPC Mode[J]. Intelligent Building and Construction Machinery, 2022, 4(2): 65-67. |
[3] | WANG Zhaozhao. Construction Technology of Cast-in-place Pile in Riprap Area[J]. Intelligent Building and Construction Machinery, 2022, 4(3): 40-42. |
[6] | TAN Chunhong. Design and Development of Gas Leak Detector for Nuclear Power Penetration Test[J]. Intelligent Building and Construction Machinery, 2021, 3(12): 62-64. |
[7] | CHEN Daguang. Reform the Quality Supervision Model to Improve the Quality of Construction Projects[J]. Intelligent Building and Construction Machinery, 2021, 3(12): 120-122. |
[8] | YAN Xiangchen. Talking about the Process Control and Decision-making of Business Bidding[J]. Intelligent Building and Construction Machinery, 2020, 2(12): 114-115. |
[9] | NI Yunlong. Analysis on the Main Points of Quality Management in the Whole Process of Large Real Estate Development[J]. Intelligent Building and Construction Machinery, 2020, 2(5): 111-112. |
[10] | ZHAO Di. Research and Development of a Horizontal Lamellars System for an Automobile Brand Fair Project[J]. Intelligent Building and Construction Machinery, 2020, 2(1): 55-58. |
[11] | WANG Weifu. Discussion on the Combination of Urban Civil Air Defense Project and Underground Space Development and Utilization[J]. Intelligent Building and Construction Machinery, 2020, 2(2): 113-115. |
[12] | LI Feng. Analysis on the Application of EPC Model in Housing Construction Project[J]. Intelligent Building and Construction Machinery, 2020, 2(2): 37-39. |
[13] | LI Dezhi. A Brief Talk on the Application Analysis of Innovative Teaching Mode in Mechanical Teaching[J]. Intelligent Building and Construction Machinery, 2020, 2(7): 104-105. |
[14] | MA Yuxin. Project Design Management under EPC General Contracting Mode[J]. Intelligent Building and Construction Machinery, 2020, 2(10): 92-93. |
[15] | MA Junyuan. Talking about the Factors Affecting the Durability of Bridge Structure and Optimization Measures[J]. Intelligent Building and Construction Machinery, 2020, 2(9): 27-28. |
[16] | FU Feng. Research on Project Cost Management Based on BIM Technology under the VAT Reform[J]. Intelligent Building and Construction Machinery, 2020, 2(12): 71-72. |
[17] | MI Yan. On the Risk and Preventive Measures of the Management Mode of Construction Project Agent[J]. Intelligent Building and Construction Machinery, 2020, 2(1): 91-92. |
[18] | ZUO Le. On Construction Technology of Bridge Reinforcement Connection in Beamcolumn Core Area of Rigid Concrete Structure[J]. Intelligent Building and Construction Machinery, 2020, 2(3): 42-44. |
[19] | MO Huajun. Difficulties and Measures of Construction Management in EPC Mode[J]. Intelligent Building and Construction Machinery, 2020, 2(12): 79-80. |
[20] | CHEN Yun. Financing Characteristics and Ways under PPP Mode in Engineering Projects[J]. Intelligent Building and Construction Machinery, 2020, 2(10): 105-106. |