LI Shixing. Analysis of the 70-hour Construction Plan for Crossing the Western Throat of Wuxi Ⅲ Field[J]. Intelligent Building and Construction Machinery, 2021, 3(1): 24-26.
Citation: LI Shixing. Analysis of the 70-hour Construction Plan for Crossing the Western Throat of Wuxi Ⅲ Field[J]. Intelligent Building and Construction Machinery, 2021, 3(1): 24-26.

Analysis of the 70-hour Construction Plan for Crossing the Western Throat of Wuxi Ⅲ Field

  • Received Date: 2020-12-08
  • Rev Recd Date: 2021-01-20
  • Available Online: 2021-09-22
  • Publish Date: 2021-01-28

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (113) PDF downloads(2) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return