Citation: | LI Zonghao. Talking about the Contents and Problems of the Audit Related to the Completion Settlement[J]. Intelligent Building and Construction Machinery, 2020, 2(2): 122-124. |
[1] |
GB50500-2013,建设工程工程量清单计价规范[S].北京:中国计划出版社,2013.
|
[2] |
DBJD25-44-2013,甘肃省建筑与装饰工程预算定额[S].北京:中国建材工业出版社,2013.
|
[2] | MA Fengping. Discussion on Construction Project Quality Control Based on EPC Mode[J]. Intelligent Building and Construction Machinery, 2022, 4(2): 65-67. |
[3] | YANG Qingmeng. Analysis of Key Points of Pre-settlement of Construction Project Cost[J]. Intelligent Building and Construction Machinery, 2022, 4(1): 123-125. |
[4] | CHEN Daguang. Reform the Quality Supervision Model to Improve the Quality of Construction Projects[J]. Intelligent Building and Construction Machinery, 2021, 3(12): 120-122. |
[5] | PANG Xiangjin. Analysis on the Problems of Budget and Settlement of Municipal Engineering EPC Project[J]. Intelligent Building and Construction Machinery, 2021, 3(4): 101-103. |
[6] | YANG Gang. Analysis of the Problems and Countermeasures in the Audit of the Cost Settlement of Mechanical and Electrical Installation Projects[J]. Intelligent Building and Construction Machinery, 2021, 3(6): 108-110. |
[7] | WANG Yingmo. Practical Research on the Renewal and Reuse Mode of Ancient Building Function[J]. Intelligent Building and Construction Machinery, 2020, 2(7): 115-116. |
[8] | XIE Qiaoling. Application and Development of Innovative Mode in Construction Engineering Management[J]. Intelligent Building and Construction Machinery, 2020, 2(6): 59-60. |
[9] | HE Yang. Discussion on the Business Model Development of Construction Projects under the Background of "New Infrastructure"[J]. Intelligent Building and Construction Machinery, 2020, 2(6): 115-116. |
[10] | CAI Mingli. On Project Risk Management Strategy under EPC General Contract Mode[J]. Intelligent Building and Construction Machinery, 2020, 2(4): 78-80. |
[11] | JIA Xiaobin. Analysis of the Dilemma of "Double Random and One Open" Fire Supervision Model and Its Countermeasures[J]. Intelligent Building and Construction Machinery, 2020, 2(1): 113-115. |
[12] | CUI Weiran. Research on Service Mode of Surveying and Mapping Geographic Information Based on Smart City[J]. Intelligent Building and Construction Machinery, 2020, 2(1): 106-107. |
[13] | MO Huajun. Difficulties and Measures of Construction Management in EPC Mode[J]. Intelligent Building and Construction Machinery, 2020, 2(12): 79-80. |
[14] | MA Yuxin. Project Design Management under EPC General Contracting Mode[J]. Intelligent Building and Construction Machinery, 2020, 2(10): 92-93. |
[15] | LI Dezhi. A Brief Talk on the Application Analysis of Innovative Teaching Mode in Mechanical Teaching[J]. Intelligent Building and Construction Machinery, 2020, 2(7): 104-105. |
[16] | LI Feng. Analysis on the Application of EPC Model in Housing Construction Project[J]. Intelligent Building and Construction Machinery, 2020, 2(2): 37-39. |
[17] | HAN Yanfeng. Talking about the Common Problems and Matters Needing Attention in the Construction Project Settlement Audit[J]. Intelligent Building and Construction Machinery, 2020, 2(12): 105-106. |
[18] | LI Xianbo. Discussion on the Effect of Carrying out Project Cost Pre-settlement Work on Construction Engineering Design and Construction[J]. Intelligent Building and Construction Machinery, 2020, 2(6): 113-114. |
[19] | WANG Shiyan. Discussion on the Check and Analysis of Reinforcement Engineering Quantity in Completion Settlement[J]. Intelligent Building and Construction Machinery, 2020, 2(4): 109-110. |
[20] | WU Yunxia. Discussion on the Key Points of Construction Project Completion Settlement Compilation[J]. Intelligent Building and Construction Machinery, 2020, 2(4): 107-108. |