| Citation: | LI Xiaobing. Application of Comprehensive Drainage System in TBM Tunneling with Large Slope and Long Distance[J]. Intelligent Building and Construction Machinery, 2021, 3(9): 23-25. |
| [1] |
雷升祥.斜井TBM法施工技术[M].北京:中国铁道出版社,2012.
|
| [2] |
侯国祥,孙江龙,王先洲,等.工程流体力学[M].北京:机械工业出版社,2006.
|